Pre-Production Patch Maintenance completed at 8:35 am, all test and development servers which were patched this morning are back on line. The next scheduled Patch Maintenance, is the Production Patch Maintenance on Sunday the 25th of September 2011. Another blog will be posted prior to the Patch Maintenance day.
Pre-Production Patch Maintenance window for this month will be Thursday the 15th of September from 7 am to 9 am. The following pre-production servers may be unavailable due to maintenance during this time:
Linux and Windows systems:
1. lummi
2. hope
3. Decatur
4. Squaxin
5. Shaw
6. Philchuck
7. mysqldev
8. moodle2
9. kickstart
10. ldaprelay-dev
11. tomcat-dev
12. maharadev
13. alacartedev
14. vmctdb1-d
15. vmlxss1-d
16. vmlxss2-d
17. vmlxwb2-d
18. vmlxwb3-t
19. lxss3
20. lxwb4
21. FIDALGO
22. ISIS
23. OSIRIS
24. KETRON
25. VS0
26. ATHABASCADEV
27. SERVICEDESKACD
28. BASIS (VM)
29. KRONOSTEST (VM)
30. SOUNDNETDEV (VM)
31. WNPH-P (VM)
32. WNFM1-D
33. WNFM2-D
34. WNCU01-D
35. WNXA01-D
36. WNBA01-P
37. WNXA02-D
Furthermore, Oracle systems may be unavailable starting at 6:00 AM:
bjp for ridge and summit
banner for ridge and summit
Job submission for ridge and summit
OAS on hope and deactur
Oracle Forms on Fidalgo