[Completed] Pre-Production Maintenance 07/21/2011 from 7:00 am to 9:00 am

The Pre-Production patching has been completed at 8:55 am. The next scheduled outage will be Sunday the 31st of July, for all remaining Production servers. A separate blog post will be posted.

Pre-Production Patch Maintenance window for this month will be Thursday the 21st of July from 7 am to 9 am. There will also be a CommVault version 9 upgrade to all servers being backed up by CommVault as well as Oracle Agents to servers which have Oracle currently running. The following pre-production servers may be unavailable due to maintenance during this time:

Linux and Windows systems:

1. lummi
2. hope
3. Decatur
4. Squaxin
5. Shaw
6. Philchuck
7. mysqldev
8. moodle2
9. kickstart
10. ldaprelay-dev
11. tomcat-dev
12. maharadev
13. alacartedev
14. vmctdb1-d
15. vmlxss1-d
16. vmlxss2-d
17. vmlxwb2-d
18. vmlxwb3-t
19. lxss3
20. lxwb4
21. FIDALGO
22. ISIS
23. OSIRIS
24. KETRON
25. VS0
26. ATHABASCADEV
27. SERVICEDESKACD
28. BASIS (VM)
29. KRONOSTEST (VM)
30. SOUNDNETDEV (VM)
31. WNPH-P (VM)
32. WNFM1-D
33. WNFM2-D
34. WNCU01-D
35. WNXA01-D
36. WNBA01-P
37. WNXA02-D

Furthermore, Oracle systems may be unavailable starting at 5:00 AM:
bjp for ridge and summit
banner for ridge and summit
Job submission for ridge and summit
OAS on hope and deactur
Oracle Forms on Fidalgo